In Silverleaf, home projects have been reviewed by the Ranch Association Modification Committee and the DC Ranch Covenant Commission. Homeowners have learned that split one approval letter at a time.
On January 1, 2027, the split goes away. DC Ranch's October 2026 Ranch Roundup says one body will receive everything from then on, and the current Modification Committee process runs through the end of December. A Silverleaf owner with a winter project now has a few weeks of the familiar process left, and the remaining meetings fit on a short list.
What changes on January 1
The October 2026 Ranch Roundup put the change in four sentences.
"Beginning Jan. 1, 2027, the DC Ranch Covenant Commission will become the central destination for DC Ranch design review and modification applications. This transition will bring the process together in one place, making it easier for residents to know where to go and who to contact when planning improvements to their homes. The existing modification review process remains in place through Dec. 31, 2026. More information will be shared soon."
The same issue puts Silverleaf on its masthead as one of DC Ranch's four villages, with Country Club, Desert Camp and Desert Parks. The change covers all four. Silverleaf owners feel it more because the Covenant Commission already plays a large part in how Silverleaf homes are built.
Two desks, split at a hundred square feet
Today the Modification Committee handles everyday changes. Under its charter, it reviews modifications to existing homes in Desert Camp, Desert Parks, Country Club and Silverleaf. That includes landscape reviews and inspections and architectural modifications under 100 square feet. The charter describes the Covenant Commission's role in that work as limited.
The committee handles more than you might expect. DC Ranch's Home & Landscape Changes page says every exterior home and landscape change needs approval in advance, backyard work included, and it lists lighting and security cameras as examples. The September 2026 Ranch Roundup repeated that changes to existing landscape lighting need modification approval. It also told residents to contact the Ranch Office for lighting requirements specific to Silverleaf. Silverleaf also has its own landscape maps and guidelines on that page for The Parks at Silverleaf and Arcadia at Silverleaf.
The Covenant Commission handles larger projects. Per DC Ranch, it is a five-member body, supported by design professionals, that sets architectural and landscape standards and reviews architectural design submissions. DC Ranch lists a separate form for building additions over 100 square feet, with a design-review fee based on square footage. New homes go through three Commission submissions, Massing, Preliminary and Final, according to DC Ranch's builder guidelines.
The Commission's authority runs deep in Silverleaf. The Arcadia at Silverleaf design review procedures send preliminary and final custom-home review to the Commission.
What the 2025 fee schedule lists
The Home & Landscape Changes page links to a 2025 Modification Fee Schedule, revised March 11, 2025. Some line items cost far more than others:
| Project on the 2025 sheet | Fee |
|---|---|
| Pool/spa combined with landscape | $1,000 |
| Convert covered patio to living space | $750 |
| Add 100 sq. ft. or less | $750 |
| Add or remove columns | $500 |
| Driveway gate | $500 |
| Front yard or back yard plantings | $400 each |
| Ramada | $300 |
| Patio or pergola | $200 each |
| Landscape lighting plan | $200 |
| HVAC, mini-split or mechanical equipment | $200 |
| Front entry door, garage door or windows | $100 each |
| Solar panels | $100 |
| String lights | $100 |
| Security cameras, EV pack, satellite dish | No fee |
Two rows on the sheet carry the same price. Enclosing a covered patio and adding up to 100 square feet are both listed at $750. A pergola is listed at $200, and a pool-and-spa package with landscape is listed at five times that. The sheet lists solar panels at $100 and no fee for security cameras.
Paint is handled separately. Paint applications have their own form and supporting documents, may carry a fee, and the page says review can take up to 10 days.
The Modification Committee's remaining 2026 meetings
The Modification Committee meets from 2 to 4 p.m., and its remaining 2026 dates are listed on DC Ranch's meeting series page. The Home & Landscape Changes page requires a complete submittal at least seven business days before a scheduled meeting. A complete submittal includes the application form, supporting material, site photos, any fee and a neighbor notice where one is required. The page also says review may take up to 30 days.
The remaining listed meetings are:
- Tuesday, Nov. 24.
- Tuesday, Dec. 8.
- Tuesday, Dec. 22. This is the last listed meeting before the current process ends on Dec. 31.
The event listings ask for requests "one week prior to the meeting."
The other DC Ranch plan now under construction
The design-review change isn't the only original DC Ranch arrangement in motion this season. On Thompson Peak Parkway, the City of Scottsdale held a groundbreaking on Oct. 27 for a second bridge over Reata Wash. Per the City's Oct. 28 announcement, it is a $14.2 million project that removes the spot where four travel lanes narrow to two across the existing bridge. When DC Ranch was developed, the City and the developer agreed to design two bridges but build only one, because traffic did not yet justify the second. The agreement left the City to build the second bridge once the area grew.
- Schedule. Construction was set to begin Monday, Nov. 2, on weekdays from 7 a.m. to 5 p.m., and is expected to take about 12 months.
- First phase. Native plant salvage, underground utility work and shaft drilling for bridge supports, mostly below grade in the wash. Travel lanes are not affected during this phase.
- The finished road. Four continuous travel lanes with bike lanes from Scottsdale Road to 100th Street, and a sidewalk on the new bridge.
- Direction and railing. The new bridge sits on the east side for northbound traffic, and the existing bridge's wood railing will be replaced with metal to match it.
- Contractor. Ames Construction, under a contract capped at $8,085,461.26 that Scottsdale City Council approved on Sept. 22.
- Questions. The project hotline is 602-290-0729.
City Manager Greg Caton called it "another example of Scottsdale moving forward on projects approved by voters," in the City's announcement. Most of the funding comes from Question 2 of the 2019 bond program, and the rest from the City's 0.2% transportation sales tax.
This post is general information about published DC Ranch procedures and fees, not legal or financial advice. Confirm your own project's requirements with the Ranch Office or the appropriate professional before you submit.
If a pergola, a patio enclosure or a new lighting plan is part of your plans for your Silverleaf home this winter, and you want to know how that work could affect your home's value down the road, Fine Homes Group is glad to talk it through with you. Schedule a white-glove consultation, or request a complimentary home valuation before the first application goes in.